Village of Grafton, Ohio
REQUEST FOR PROPOSAL
REPLACEMENT OF WATER ERTS
(Issued August 8, 2023)
The Village of Grafton is accepting proposal to replace 1200 existing 100W ERTS with new 500W ERTS on homes and businesses in the Village of Grafton.
Approximately 1,000 ERTS are located on the outside of the building using existing wire and connectors. The remaining approximately 200 ERTS are located on the inside of the building using existing wire and connectors. This proposal for the installation of the ERTS only.
Project to begin within two weeks of award and should be completed no later than December 31, 2023.
Proposals should be emailed to Village Administrator Joe Price at jbprice@villageofgrafton.org by August 25, 2023 no later than 4:00 pm.
Questions on the project can be directed to Village Administrator Joe Price at jbprice@villlageofgrafton.org until August 18, 2023.
PROPOSALS RECEIVED
August 25, 2023
ERT Installation RFP Results:
PMI
PROFESSIONAL METERS, INC.
3605 N State Route 47, Morris, IL. 60450 $ 95,984.00 (Apparent LOW PROPOSAL)
_________________________________
VANGUARD
1421 West 9th Street
Owensboro, KY 42301 $118,466.71
_________________________________
Terrace Construction
3965 Pearl Rd
Cleveland, OH 44109 $305,587.48
===============================================
INVITATION TO BID
SEALED BIDS for the furnishing of the necessary materials and construction of the
WASHINGTON DRIVE IMPROVEMENTS
WATERLINE REPLACEMENT
VILLAGE OF GRAFTON, OHIO
will be received by the Village of Grafton, Ohio at the Office of the Clerk-Treasurer, 960 Main Street, Grafton, Ohio 44044 until
11:00 A.M. (Local Time), THURSDAY, JULY 13, 2023
INVITATION TO BID Washington Drive
July 18, 2023 BID AWARD:
Buckeye Excavating & Construction Inc. $575,387.00
The Village of Grafton is accepting proposal to replace 1200 existing 100W ERTS with new 500W ERTS on homes and businesses in the Village of Grafton.
Approximately 1,000 ERTS are located on the outside of the building using existing wire and connectors. The remaining approximately 200 ERTS are located on the inside of the building using existing wire and connectors. This proposal for the installation of the ERTS only.
Project to begin within two weeks of award and should be completed no later than December 31, 2023.
Proposals should be emailed to Village Administrator Joe Price at jbprice@villageofgrafton.org by August 25, 2023 no later than 4:00 pm.
Questions on the project can be directed to Village Administrator Joe Price at jbprice@villlageofgrafton.org until August 18, 2023.
Envision Main St Phase 2 Improvements
To Newspaper:
Advertise: Wednesday, January 4th, 2023 & Wednesday, January 11th, 2023 & Wednesday, January 18th, 2023
Bid Results January 26, 2023:
Buckeye Excavating & Construction Inc – $ 1,190,961.85 (apparent low bid)
D.L. Smith Concrete, LLC – $ 1,212,622.40
Fabrizi Trucking & Paving – $ 1,565,121.70
Bids are under review. Anticipated AWARD date is February 21, 2023
___________________________________
___________________________________
__________________________________________________________________________